Piramal Aranya
Piramal Aranya
Enquire Now

Towers & RERA

Avyan, Arav, Ahan I & Ahan II

Piramal Aranya is a three-tower development. The towers were launched and delivered in sequence, and each carries its own MahaRERA registration.

Piramal Aranya Towers & MahaRERA Registrations

Piramal Aranya has no single project-level RERA registration. Each tower is separately registered with MahaRERA, so quoting one tower's number as “the” project RERA number — as several listing portals do — is incorrect. All four registrations are listed below and can be verified independently on the MahaRERA portal.

Avyan (Wing A)

41 storeys
MahaRERA
P51900003324
Configurations
2, 3 & 4 BHK
Carpet area
Up to 1,670 sq.ft.
Slab height
Up to 3.6 m floor-to-floor
Status
Delivered — ready to move in
Signature
L-shaped corner windows in the master bedrooms

The first tower handed over at Piramal Aranya, and the one with the most generous ceiling volume in the project at up to 3.6 m floor-to-floor.

Arav (Wing B)

72 storeys
MahaRERA
P51900018039
Configurations
2, 3, 4 & 5 BHK, incl. deck residences
Carpet area
Up to 2,843 sq.ft.
Slab height
3.3 m floor-to-floor
Status
Delivered
Signature
The tallest residential tower in Byculla

Carries the project's largest formats, including the 5 BHK and duplex-style layouts where the garden, harbour and city-skyline views come together at once.

Ahan I (Wing C)

Up to 49 storeys
MahaRERA
P51900020330
Configurations
2 & 3 BHK
Carpet area
635 – 920 sq.ft.
Slab height
3.25 m floor-to-floor
Status
Occupancy Certificate received — ready to move in
Signature
Sits directly above the Aranya Clubhouse

Carries the Ahan-exclusive amenity set — the Rooftop Observatory Deck, a tower-level Fitness Centre, and the Library and Reading Lounge.

Ahan II (Wing C2)

Up to 59 storeys
MahaRERA
P51900051735
Configurations
2, 3 & 4 BHK
Carpet area
500 – 1,392 sq.ft.
Slab height
3.25 m floor-to-floor
Status
Topped out, finishing works underway — RERA possession December 2027
Signature
The only wing offering 4 BHK homes in the Ahan band

The only wing still available as direct-from-developer inventory at scale, registered with MahaRERA on 27 June 2023 with 292 residences and escrow banking at HDFC Bank.

⚠️ Note:Buyers should treat RERA-declared possession dates as the legally binding dates, and marketing or “target” possession dates as indicative only. Verify every registration at maharera.maharashtra.gov.in.

Ahan I vs Ahan II — The Practical Differences

This is the question serious buyers ask most often, because the two Ahan wings look alike on a brochure and behave very differently in practice. One of the two wings frames Rani Baug; the other opens to the Eastern Harbour.

FactorAhan I (Wing C)Ahan II (Wing C2)
PossessionOccupancy Certificate received — ready to move in todayFinishing works underway, December 2027 RERA date
Configurations2 & 3 BHK only2, 3 & 4 BHK — the only Ahan wing with 4 BHK homes
RERA carpet bandapprox. 635 – 920 sq.ft.approx. 500 – 1,392 sq.ft. — a lower entry ticket
FloorsUp to 49 storeysUp to 59 storeys
AvailabilityResale inventoryDirect-from-developer inventory at scale
Shared across bothFloor-to-ceiling windows, 3.25 m floor-to-floor, private balconies on select unitsIdentical access to all project amenities, including the Ahan-exclusive rooftop observatory deck

So which should you buy?

Choose Ahan I for immediate occupation — it has its Occupancy Certificate and you can move in today. Choose Ahan II for a 4 BHK format, or for a lower entry price on a construction-linked timeline with a December 2027 RERA possession date. Buyers who need certainty of occupation should look at the delivered towers or Ahan I resale rather than Ahan II.

An Unusual Range of Risk Profiles Within One Address

Most Mumbai projects offer one risk profile: either you buy ready, or you buy under construction. Piramal Aranya offers both at the same address.

Ready-to-move inventory

Avyan and Arav are delivered, and Ahan I has received its Occupancy Certificate. You can walk the actual building, see the finished common areas and the real view from the real floor, and move in without construction risk. Inventory here is largely resale.

Under-construction entry

Ahan II is topped out with finishing and fit-out works underway and MahaRERA-reported average construction progress of approximately 76%. It carries a lower entry ticket, the only 4 BHK homes in the Ahan band, and a December 2027 RERA possession date.